10 Jul 2023
A building being demolished with a green skip from Kirkby Skips in front and behind guard rails. Between the building and the skip is crane.

Kirkby Skips Ltd have been awarded the contract with Civils & Remediation Ltd for the demolition of St Chads Hotel in Blackpool.

The building occupied by the St Chad’s Hotel dates back to 1893 with the remainder of the buildings being added in stages since around 1912.

With the building left unsafe by a huge fire, the demolition of the popular hotel is expected to take 6 months.

As in all Works carried out by Kirkby Skips Ltd, there will be zero waste to landfill.

A green skip from Kirkby Skips atop a lorry.